Mechanical · MEP (HVAC Systems)

Commercial Building HVAC Design

Intermediate 5 weeks 35-60 hours

Build a small duct system where one fan feeds two or three zones. Change damper positions and measure how airflow and temperature shift in each zone.

Major

Mechanical

Focus area

MEP (HVAC Systems)

Total hours

35-60 hours

What you'll need

  • 12V DC centrifugal blower fan
  • DHT22 AM2302 temperature humidity sensor module 3 pack
  • MG996R metal gear servo motor for damper control
  • Arduino Mega 2560 R3 microcontroller board
  • flexible ducting hose 4 inch
  • anemometer wind speed sensor for Arduino 0-5V output
Shop these parts on Amazon
Shop the parts on Amazon

As an Amazon Associate, I earn from qualifying purchases.

Steps

  1. Build a scaled duct system feeding 2 or 3 zones from the blower fan.
  2. Add a servo-driven damper and temperature sensor in each zone.
  3. Measure airflow at each zone outlet with the anemometer.
  4. Test how different damper positions change airflow and zone temperatures.
  5. Find the damper settings that balance the zones.
  6. Chart the results and document the system for your portfolio.

What to photograph for your portfolio

  • Ducted demo build
  • zone temperature logs
  • damper vs airflow tests
  • balancing analysis

Resume bullet starters

Copy one, then swap in your own numbers.

  • Built a scaled duct system with servo dampers and temperature sensors in [X] zones

  • Balanced airflow across zones within [X]%

  • Charted how damper position changed zone temperature

Skills you'll show off

HVAC designairflow balancingsensor loggingductwork principles

Enjoying the site?

Every tool here is free. If it helped you, you can buy me a coffee.

Buy me a coffee